RP Sequin Punching Machine Installation Guide
I. Operation Steps (Refer to Operation Guide)
- To balance the machine on the ground before using it, then connect it with 220V power and ground wire, turn power on (1) in direct way counter (8) will turn on.
- Pass the spangles into mould by hand, please make sure to tighten the screw nut by one side of the shaft to guarantee spangles roll moves simultaneous with material roll shaft, Take one end of spangle by right hand and guide it getting through the mould, meantime revolving the hand wheels (13), move the mould to the highest place, push the spangles to the top of the CPRE of mould, do the same thing in several times until the spangles get through the mould, drawn by hand, then start to punch the mould.(please take note that don't punch the mould in the same place, otherwise the fragments will stuff the mould). Sequins spangles comes out from the mould by 20-30cm automatically when mould close and open, then please put the punched spangles into the plastic disc(14) accordingly.
- One module comes two spangles. Counter setup: Machine punches 2 sequins pieces one time, setup counter as XXXX*10 (or *1 or *100), for example set counter to 1500*10, then it equals to punching 2*1500*10 = 30000 pcs of sequins
- Press the roll spangle button (2), then press punch mould buttons (6), adjust the speed to be fast slowly (3).
- Set the quantity on counter before opening machine. Then press "restore button (9)", the main motor will stop spontaneously when the quantities full, if re-open machine, you must press "restore button (8)" firstly.
- When cleaning or changing the mould, it only needs to loose above and below eight inner M8 SCREWS (10), then adjust the mould into the highest place, don't loose the above four nuts (11), take the core of mould out, set the screws after changing.
- When the mould is stuffed and spangles cannot get through the mould.
- Adjust the mould to the highest place, below the direction from entry spangle to exit spangle by windpipe.
- If it still cannot work by bellowing, you should take out the mould, considering the way of above stated numbers 5, you can pull out complete set of above mould plate 1&2, then take out the below mould plate No.(12),don't touch other plates, at the same time machine will punch out scraps during works.
- Take care and don't let any dust rubbish enter the mould, spray demould detergent when the module reach 10000 times, add lubricating oil on some moving places.
II. Alarm
When alarm is on it indicates waste bin is full. If alarm is false then shake the material container it will work.
III. Maintenance:
Oil white sewing machine oil twice on four of Ф12 Guide Rails and precision die heads everyday. Clean and oil other running parts once every 3 months.
IV. Installation:
Must be done by trained maintenance engineer
V. Power cord must be grounded properly to prevent power leak.
VI. during punching process if sequins plate jumps, use fabric strip to clean material holding shaft and get rid of friction powder. (Caution: No oil on holding shaft.)
VII. Relay-1 Feeding Delay Control controls material Roll release length.
VIII. Main Punching Machine default speed is set at 500 pcs /min.